Split by Building Feature
Track and bill storage costs separately for different buildings within your warehouse facility
Overview
The "Split by Building" feature allows you to separate storage cost calculations based on different buildings within your warehouse or facility. This functionality provides granular control over storage cost calculations and is particularly useful for multi-location operations with different cost structures.
Field Specification
Property | Value |
---|---|
Field Name | Split by Building |
Type | Option |
Options | " " (Blank), Yes |
Location | Agreement Detail Line Table |
Applicable to | Storage Cost line types only |
How It Works
When Enabled
- Creates separate invoice lines for storage costs per building
- Works exclusively with Storage Index quantity calculations
- Provides building-specific cost tracking and analysis
Requirements
- Line type must be "StorageCost"
- No existing invoice periods for the detail line
- Storage Index system must be active
Configuration
Setting Up Split by Building
- Navigate to Agreement Detail Line
- Select a StorageCost line type
- Set "Split by Building" to "Yes"
- Save the configuration
Important Timing
⚠️ Configure this option BEFORE creating any invoice periods
Validation Rules
When You Can Enable
✅ Line type is "StorageCost" ✅ No invoice periods exist for the detail line
When It's Blocked
❌ If invoice periods already exist, you'll see this error:
"Cannot split by building when periods already exist.
Please create a new detail line with the correct Valid From and Valid To Date."
Best Practices
✅ Do This
- Configure before creating invoice periods
- Create new detail lines for existing agreements if needed
- Use when you need building-specific tracking
- Plan your building structure before implementation
❌ Avoid This
- Don't try to enable on existing periods
- Don't use for non-storage cost line types
- Don't change without considering existing agreements
Use Cases
Multi-Building Warehouse
Your facility has buildings A, B, and C with different operating costs. Enable "Split by Building" to:
- Generate separate invoice lines per building
- Track costs individually for each location
- Provide detailed billing to customers
Client-Specific Buildings
Some customers require dedicated building space:
- Bill separately for premium building locations
- Maintain clear cost separation
- Provide transparent billing breakdown
Cost Center Tracking
Different buildings have different cost structures:
- Track profitability by building
- Analyze utilization per location
- Support management reporting
Technical Impact
System Components Affected
- Agreement Detail Line Table
- Agreement Line Invoice Period Table
- Storage Cost calculations
- Invoice generation process
Processing Changes
- Invoice line generation logic modified
- Storage cost calculations split by building
- Agreement period handling adjusted
Troubleshooting
Common Issues
Problem: Cannot enable Split by Building Solution: Check if invoice periods exist; create new detail line if needed
Problem: Not seeing separate building costs Solution: Verify line type is "StorageCost" and Storage Index is active
Problem: Want to change existing agreement Solution: Create new detail line with correct dates and settings
Related Documentation
- Storage Index Setup Guide
- Storage Index Overview
- Agreement Detail Line documentation
This feature enables precise cost tracking and billing for complex warehouse operations with multiple buildings.