Opens a listpage with al the orders planned on the trip.
Order Package Processing
Opens the page Packaging to registered packeges loaded/unloaded on the section.
Create irregularrity
Opens the page Irregularity to register irregularities on the section.
Fields
Field
Description
Load Sequence
The sequence number on loading the section. Depending on the field: Sequence Calculation in the tab: Planning in the Transport Setup a value will be calculated when planning sections on a trip. If necessary the value can be changed manually to change the sequence of loading.
Unload Sequence
The sequence number on unloading the section. Depending on the field: Sequence Calculation in the tab: Planning in the Transport Setup a value will be calculated when planning sections on a trip. If necessary the value can be changed manually to change the sequence of unloading.
No.
The ordernumber of the section. If Additonal Activities have been added the tripnumber will be shown.
Loading Date From
The date on which the section is available to collect.
Loading Date To
The date on which the section must be picked up at the latest.
Loading Time From
The time on which the section is available to collect.
Loading Time To
The time on which the section must be picked up at the latest.