Table of Contents

Toll Calculation

General

When calculating a Trip the Toll Calculation Functionality determines and registers toll information and costs on the Trip. Based on the footprint principle the toll-cost will be devided among the individual Sections planned on a Trip.

Note
  • A PTV User & Sustainability Management Licence is required to use the Toll Calculation functionality.
  • "Actual toll costs may differ from calculated toll costs as the route driven can vary from the planned route.

Functionality

The toll calculation is based on the PTV Vehicle Profile and the planned route calculated.

Once a Trip has been calculated the Toll will be shown in the factbox:

Example of Toll in a Trip Factbox. Trip factbox Toll

Depending on the level set in the Calculation Methode, the Tol costs will be specified per Country or per section.

Toll allocation per section

In 3PL Dynamics, the total toll costs of a Trip are divided among the individual Sections on the Trip. This division is based on the footprint principle. The footprint can be determined as follows:

  • For each Section on a Trip the distance between the place of loading and unloading is determined.
  • This distance is multiplied with the chargeable weight of the goods on that section.
  • The sum of all Sections footprints results in the total Trip footprint.
  • The percentage per Section is calculated by deviding the the footprint of each Section by the total Trip footprint.
  • Finally, the toll costs of the Trip are allocated to each Section based on these percentages.
Tip

By including the Agreement Quantity Calculation / Criteria function: Toll Revenue in a Contract the allocated toll cost can be charged to a Customer including a margin.

Best Practice Example

A trip executed has a total distance of kilometer: 450 km. PTV Developer has determined that on the distance traveled and the vehicle-profile € 35,- toll-costs are to be expected.

Section Section Distance Chargeable Weight Footprint Percentage Toll-costs allocated
A. 200 km 10.000 kg 2.000.000 44,45 % € 15,55
B. 150 km 10.000 kg 1.500.000 33,33 % € 11,67
C. 200 km 5.000 kg 1.000.000 22,22 % € 7,78
Total 4.500.000 100,00 % € 35,00

Settings

The following settings are applicable on the Toll Calculation: